Frodsham Wind Farm is a nineteen-turbine 50.35MW, Wind Farm, located in Frodsham, Cheshire. 

Atmos was initially the project ECoW through the construction phase and was retained to undertake post construction monitoring (PCM). onerous planning condition, requiring turbines to be powered down at key times during the bat active  season to avoid bat fatalities. 

This short video shows how we developed some innovative solutions with the support of our friends at Wagtail dogs that reduce the level of curtailment, helping our client produce an extra 3000MWh annually.

 

 

What our Client Said:

“As a result of the work Atmos have carried out, bringing together science with the data gathered from the wind farm, we have managed to reduce the amount of wind turbine down time by proving to the local    planning authority that there would not be a detrimental effect on bats. This equates to an extra 3000MWh of green energy being produced per year.’ 


Contact us today to find more about how our innovative solutions can support your next project.